Since our wheeled skid steer can't get the job of backfilling the garage done because the gravel ramp is too unsafe and unstable, we had to come up with a better option. Fortunately our contractor, Harold, had a tracked machine at his other job site. With the smaller and lighter machine delivered to site, we were able to get the garage backfilled and ready for framing.
|
With the machinery gone, garage framing can begin. Yard is prepped for landscaping as well. |
No comments:
Post a Comment