With the priming done and having pre-booked the cabinets for delivery on August 11th, we are now moving into some of the more interesting finishing elements of the project. The cabinets selected are a flat panel black walnut veneer and combine a north american style of carpentry with a european model of appliance. Installation begins tomorrow and is planned to take up to three days for each house.
|
The factory has wrapped the boxes carefully to protect them during the long trip over from Washington state |
|
Ready to be installed and a trip to the recycling depot is going to be needed for sure |
|
The plan for the main kitchen wall with the built in appliances |
No comments:
Post a Comment