In order to access electricity from within the mechanical room in each basement we must have installed electrical panels and three above ground electrical meters installed at the garage. Power is then fed via under ground conduits to the panels. This means the garage must be framed and all the work done inside and out to pass the inspection. This is a multi step process and often subject to delays.
Fortunately our electrical team has been very cooperative and the concrete contractor put the garage pad in quickly enough that the framers could get the garage walls and roof on (this allows the overhead service to be run from the alley to the garage) and into each basement.