Tuesday 25 November 2014

Finishing the 3010 side of the duplex


With the 3012 unit complete, we are focusing further attention on getting 3010 finished so it can be sold.  With plans to start a new three unit townhouse about 10 blocks away, we would like to get the second half of the duplex sold so we can finance the new project more easily.  

Here are todays photos of the main floor of 3010.

kitchen is complete and appliances are installed

ready for construction final cleaning to begin


Finishing touches

While the pace on site appears to have slowed, many of the minor yet time consuming details are still being completed.  Selecting and ordering furniture, setting up the office, and a series of touch ups and dust removal clean ups has now been completed.  All of the appliances and bath fixtures have been used and adjusted, and glass hardware installed.  Here are some photos of the ongoing efforts

office storage system is being assembled

desk is installed and wood top stained.  

glass doors are installed in the master bathroom shower

walnut rail cap has two coats of stain and is finished

Friday 7 November 2014

Al13 architectural cladding


With the stucco and other exterior materials having been completed over the summer months, the final siding component to clad the front of the project was finally ready to be installed.  The Al13 material is an aluminum sandwich panel that is fastened to the wall with trims and a support structure rather than using exposed fasteners.  It is a painstaking process to get the substructure done properly so that the finished product looks good.  Fortunately our install team did a careful job.  Here are some recent pictures.

metal structure is applied to the wall to support the finished panels

  
the panel install is underway

the panel install is nearing completion

Finishing update

With the first home nearing completion, many of the small yet time consuming tasks are being finally completed, including project elements that have been planned or in progress for many months.

While trim was being installed, the barn door hardware was ready to be hung on the master bathroom door opening.
barn door is ready for final hardware install


The basement entertainment area is nearer to completion, with speaker installation complete.

three front speakers installed in the wall cavity

rear ceiling speakers installed

Final setting of plumbing fixtures is now complete

island fixtures are installed

bathroom fixtures are tested

The final thermostats are installed

main floor thermostat

schluter makes the in floor tile heating system, appears complex to program
Fireplaces are cleaned and prepped so the gas can be turned on.