Sunday 23 March 2014

Party wall progress


With the framers off for the weekend break, the ICF install company decided to stack the styrofoam blocks while the main floor was empty of other trades.  Ryan, while working by himself was able to install 10 ft of block and the bracing on the side of the floor that has been sheeted.  On monday, the framers will install the remaining floor material and the ICF can be prepped for the pour.

With ten foot ceilings on the main floor, the ICF wall appears massive from the street, particularly as it is the first material to be installed above the main floor level