With the raw material prepped and sent back to the shop, it seemed like a good time to visit and check on the progress.  The open tread stairs were almost ready for delivery and assembly of the final pieces were underway.  The basement stairs were also nearing completion and have a very unique look to them.  More pics will be posted once the stairs are delivered and installed next week, and again when the landings are prepped and the staining is complete.  Eventually we plan to have a unique metal railing installed.
the first flight of open rise tread stairs

the sides of each tread are intended to be exposed

Basement flight, landings will also be built using this material (4 landings total)