Monday 6 October 2014

Tile progress part 2


Tile installation is continuing and now on the main level at both front and rear foyer.  We are using a natural stone at the rear and the subfloor material is a cement board rather than a ditra matting due to the small size of the stone.  Fireplaces and basement shower is next to be installed.  



No comments:

Post a Comment