Tuesday 20 October 2015

Permeable paver install for visitor parking stall

The city issued a requirement that the project feature a permeable geotextile material be installed as the driving surface of the visitor parking stall. 

To deal with this requirement we located a new supplier that stocks the material and began the install today.  First the parking stall was levelled and bladed with the skid steer. Crushed material was added and compacted and raked. Finally the ecogrid blocks were put down.  Later we will purchase some pea gravel and fill in the ecogrid material. 