Finally some warm spring weather and the framers were able to make considerable progress.  With the melt the site has become extremely muddy and slippery.  Tomorrow the second floor joist package is delivered, so the framers will spend approximately one week assembling the floor structure, stairwell opening, and cantilevers.  Once sheated, it will be interesting to see the view out the back, as it seems likely an eastern view of downtown office buildings should be visible from the master bedroom at the rear of the house.