With the upper level now sheeted, the ICF crew has arrived and installed the forms for the top floor party wall. This will be poured on monday and the framers will begin installing the nine foot high exterior walls and preparing for the roof.

The plan for next week is to have the basements prepped with gravel, insulation, rebar and the tubing needed for the in floor heating system.  Once inspected we can pour this and the framers can install the basement walls.