Friday 19 June 2015

Framing part 9 Loft walls complete

With the framers hoisting up the last of the rake walls that for the sides of the loft space all that remains is roof completion. 

Here are some shots of the vaulted loft space is it was set into place 


Our lead framer is preparing to set the final loft wall in position. The zoom boom is doing the heavy lifting once again 


All that remains now is to set the trusses on the loft. 





No comments:

Post a Comment