Friday 5 June 2015

Pre grade and basement slab prep

To summarize the bulk of this weeks progress:

We overcame our dirt shortage and brought in a few loads to finish backfilling the side yards. 



At around the same time we had the three basement slabs prepped and poured.  



Finally we decided it was a good Oppportunity to bring in the large one piece tubs to the upper bathrooms. The zoom boom made this far easier than dragging the tubs upstairs. 