With the electricians arriving to wire not just the lights and switches inside each garage but also new sub panels and meter bases for the permanent service to each house, we are now at the point where we can begin to move away from the temporary power pole and into proper connections inside the houses. This is soon to become critical as the finisher will need a better power supply to run his table saw and compressor.  Here are some photos from the days progress

the garage is wired with boxes that will contain the plugs to power the garage.  It is now ready for insulation and drywall

With the meter bases inspected and the green sticker on the empty box, we can now have enmax arrive and connect the overhead power supply to the new meter.  From here it is all underground service into the house mechanical room