Tuesday 15 July 2014

Ready for taping to begin

With the drywall complete on the first two levels, the taper can begin to fill in the joist and prepare the walls for paint.  The basement is likely too cool for the tape to dry properly so we may have to rely on fans and air circulation to get the moisture out.  The natural gas meter delivery is still a week or two away so the furnace will not be available. Here are some pictures of the main floor with the board all hung.